Roof Flashing Requirements

Pin On Gutter Flashing

Pin On Gutter Flashing

Pin On Are Test Prep

Pin On Are Test Prep

How To Flash Corrugated Barn Roofing Google Search Roof Installation Metal Roof Installation Corrugated Roofing

How To Flash Corrugated Barn Roofing Google Search Roof Installation Metal Roof Installation Corrugated Roofing

Pin On Contractor Tips

Pin On Contractor Tips

Pin On Projects Garage

Pin On Projects Garage

Pin On For The Home

Pin On For The Home

Pin On For The Home

The international code council icc is a non profit organization dedicated to developing model codes and standards used in the design build and compliance process.

Roof flashing requirements.

For example 3 tab shingles usually have a 5 5 8 inch 143 mm exposure. If metal the flashing should be made of galvanized steel at least 0 019 inches thick irc 2015. Flashing against a vertical sidewall shall be by the step flashing method. Manufacturers requirements can vary anywhere from 2 inches to 10 inches and you probably won t be able to see the sidewall flashing completely anyway.

Usually you won t see much of drip edge as it s under the roof shingles under the underlayment and behind the roof gutter. The recommended length of step flashing is typically a minimum of 2 inches longer than the exposure of the roofing material. Shall be sheet metal or of the same material as the roof covering. The international codes i codes are the widely accepted comprehensive set of model codes used in the us and abroad to help ensure the engineering of safe sustainable affordable and resilient structures.

The vertical side will be hidden behind the exterior wall covering material. Install roof felt prior to installing the step and kick out flashing. Some building codes have specific requirements for underlayment and ice dam protection. The recommended width of step flashings will vary depending on the agency entity being referenced.

The sketch above illustrates the end profile of roof drip edge flashing and shows its placement on the roof. Requirements for roof coverings installed in high wind areas i e where the basic wind speed is 110 mph or greater are provided. This results in a 2 inch minimum head lap. Further your step flashing pieces need to be 10 inches 254 mm long and at least 2 inches 50 mm wider than the exposure of the shingle you re using.

Lengths of drip vary but typically it s sold in ten foot lengths 120. All laps shall be a minimum of 4 inches 102 mm fully sealed in approved flashing cement. Flashing against a vertical front wall as well as soil stack vent pipe and chimney. Flashing shall start at the lower portion of roof to ensure water shedding capabilities of all metal laps.

Install house siding over the step flashing ending at least one inch above the roof surface. Both codes also contain requirements for roof decks underlayment flashing structural performance and materials and testing criteria. Typically 10 by 8 inch 253 mm x 203 mm flashing is chosen. The requirements of these codes must be followed.

Check the roof measurements projections flashings slope vents etc check the attic sheathing ventilation insulation.

Pin On Roofs Roofing

Pin On Roofs Roofing

Sealing Structural Penetrations At Roof Wall Intersections Roofing Roof Repair Diy Roof Repair

Sealing Structural Penetrations At Roof Wall Intersections Roofing Roof Repair Diy Roof Repair

Pin On Week 6

Pin On Week 6

Steel Roof Flashings Roof Design Fibreglass Roof Roof Colors

Steel Roof Flashings Roof Design Fibreglass Roof Roof Colors

Source : pinterest.com